On the integration of due date setting and order release control

Thurer, Matthias and Land, Martin and Stevenson, Mark and Fredendall, Lawrence (2017) On the integration of due date setting and order release control. Production Planning and Control, 28 (5). pp. 420-430. ISSN 0953-7287

[thumbnail of Thurer-et-al_PPC_2017]
Preview
PDF (Thurer-et-al_PPC_2017)
Thurer_et_al_PPC_2017.pdf - Accepted Version
Available under License Creative Commons Attribution-NonCommercial.

Download (5MB)

Abstract

This paper calls for a paradigm shift in the production control literature away from assuming due date setting and order release are two independent decision levels. When order release is controlled, jobs do not enter the shop floor directly but are retained in a pre-shop pool and released to meet certain performance targets. This makes the setting of accurate planned release dates – the point at which jobs transition from the pool to the shop floor – a key consideration when setting due dates. We develop a new approach to estimating planned release dates to be embedded in the Workload Control concept. Our approach is unique as it anticipates the release decision as part of the due date setting procedure. This makes a second independent release decision superfluous and avoids a major cause of tardiness – deviations between (i) the planned release date used when calculating the delivery time allowance and (ii) the actual, realized release date. Simulation is used to compare the performance of Workload Control using two decision levels with the new single-level approach where the release decision is anticipated when setting the due date. Performance improvements are shown to be robust to uncertainty in processing time estimates

Item Type:
Journal Article
Journal or Publication Title:
Production Planning and Control
Additional Information:
This is an Accepted Manuscript of an article published by Taylor & Francis in Production Planning and Control on 14/03/2017 available online: http://www.tandfonline.com/10.1080/09537287.2017.1302102
Uncontrolled Keywords:
/dk/atira/pure/subjectarea/asjc/1400/1408
Subjects:
?? due date settingorder releaseworkload controlsimulationstrategy and managementmanagement science and operations researchindustrial and manufacturing engineeringcomputer science applications ??
ID Code:
84706
Deposited By:
Deposited On:
14 Feb 2017 15:34
Refereed?:
Yes
Published?:
Published
Last Modified:
24 Sep 2024 01:04