Card-based delivery date promising in pure flow shops with order release control

Thurer, Matthias and Stevenson, Mark (2016) Card-based delivery date promising in pure flow shops with order release control. International Journal of Production Research, 54 (22). pp. 6798-6811. ISSN 0020-7543

[thumbnail of Text-Figures-and-Tables]
Preview
PDF (Text-Figures-and-Tables)
Text_Figures_and_Tables.pdf - Accepted Version
Available under License Creative Commons Attribution-NonCommercial.

Download (375kB)

Abstract

Card-based systems are simple, effective means of controlling production. Yet most systems concentrate on controlling the shop floor. They neglect other planning tasks, like estimating short, feasible due dates during customer enquiry management. A card-based version of the workload control concept for job shops – COBACABANA (COntrol of BAlance by CArd-BAsed Navigation) – was proposed in the literature to overcome this shortcoming. COBACABANA uses cards for due date setting and order release, making it a potentially important solution for small shops with limited resources. But many such firms operate as flow shops rather than job shops. Research demonstrated that COBACABANA’s release mechanism must be adapted if applied to a pure flow shop, but its approach to due date setting has not been evaluated in such an environment. We show COBACABANA has the potential to improve pure flow shop performance, but its due date setting procedure should be adapted compared to job shops. In a flow shop, due date estimation can also be further simplified by considering the load awaiting release to the first (gateway) station only while maintaining most performance benefits. The results are important for all card-based systems that aim to stabilise work-in-process, including kanban and ConWIP (Constant Work-in-Process).

Item Type:
Journal Article
Journal or Publication Title:
International Journal of Production Research
Additional Information:
This is an Accepted Manuscript of an article published by Taylor & Francis in International Journal of Production Research on 22/04/2016, available online: http://www.tandfonline.com/10.1080/00207543.2016.1177672
Uncontrolled Keywords:
/dk/atira/pure/subjectarea/asjc/1400/1408
Subjects:
?? workload controlmake to order productiondue date assignmentcard-based controlcobacabanastrategy and managementmanagement science and operations researchindustrial and manufacturing engineering ??
ID Code:
79188
Deposited By:
Deposited On:
22 Apr 2016 14:54
Refereed?:
Yes
Published?:
Published
Last Modified:
03 Oct 2024 00:03