A case study of the successful implementation of workload control:a practitioner-led approach

Silva, Cristovao and Stevenson, Mark and Thurer, Matthias (2015) A case study of the successful implementation of workload control:a practitioner-led approach. Journal of Manufacturing Technology Management, 26 (2). pp. 280-296. ISSN 1741-038X

[thumbnail of H:\2\PURE Papers\Silva-et-al_JMTM_2014]
Microsoft Word (H:\2\PURE Papers\Silva-et-al_JMTM_2014)
Silva_et_al_JMTM_2014.docx - Accepted Version

Download (78kB)

Abstract

Purpose Workload Control (WLC) is a Production Planning and Control (PPC) concept of particular relevance to small and medium sized Make-To-Order (MTO) companies. Despite the simplicity of its core principles, few successful implementations have been reported, and both understanding and awareness of the concept amongst practitioners is limited. We describe a rare successful implementation of WLC in which elements of the concept were embedded in a company to support both customer enquiry management and order release. The main focus is on the implementation process itself rather than the impact on performance. Design/methodology/approach A particularly novel aspect of the case is that the implementation was practitioner (rather than researcher) led. A manager chose to read up on and implement the concept, creating a strong in-house commitment to the initiative. The researchers played a facilitating role, e.g. intervening where necessary to answer questions and advise. A factory visit/tour and interview were also conducted post implementation to reflect on the process. Findings We identify the elements of WLC implemented by the practitioner and how they were refined to meet company requirements, with implications for improving the alignment between theory and practice. The paper also informs the implementation process, for example, by highlighting the importance of managerial championing for implementation success and how WLC can be implemented based on a reasonably simple Excel© spreadsheet. Research limitations/implications More empirical evidence is required to assess the generality of some of the adaptations made by the practitioner; and to collect longitudinal quantitative evidence on the performance of Workload Control over time. Simulations could also be conducted to confirm the effectiveness of adaptations observed in the study. Practical implications The case has implications for the process of implementing WLC and may provoke a rethink in terms of the range of companies for which the concept is thought to be appropriate – the case described is of a larger, higher volume company than most previous WLC implementations. Originality/value A rare case of a successful implementation of WLC at both the customer enquiry management and order release levels; the only practitioner-led implementation of WLC reported in the literature to date.

Item Type:
Journal Article
Journal or Publication Title:
Journal of Manufacturing Technology Management
Additional Information:
This article is (c) Emerald Group Publishing and permission has been granted for this version to appear here http://www.research.lancs.ac.uk/portal/en/publications/a-case-study-of-the-successful-implementation-of-workload-control(3d84802b-6961-4dcd-9738-f7aeb19ebf9a).html. Emerald does not grant permission for this article to be further copied/distributed or hosted elsewhere without the express permission from Emerald Group Publishing Limited.
Uncontrolled Keywords:
/dk/atira/pure/subjectarea/asjc/1700/1706
Subjects:
?? STRATEGY AND MANAGEMENTSOFTWAREINDUSTRIAL AND MANUFACTURING ENGINEERINGCONTROL AND SYSTEMS ENGINEERINGCOMPUTER SCIENCE APPLICATIONS ??
ID Code:
69222
Deposited By:
Deposited On:
16 Apr 2014 08:03
Refereed?:
Yes
Published?:
Published
Last Modified:
16 Sep 2023 01:04