Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

Teunter, Ruud and Kaparis, Konstantinos and Tang, Ou (2008) Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. European Journal of Operational Research, 191 (3). 1241–1253. ISSN 0377-2217

[thumbnail of Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing]
Preview
PDF (Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing)
10.pdf - Submitted Version

Download (263kB)

Abstract

We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns. Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.

Item Type:
Journal Article
Journal or Publication Title:
European Journal of Operational Research
Uncontrolled Keywords:
/dk/atira/pure/subjectarea/asjc/2600/2611
Subjects:
?? elspreturns remanufacturing reverse logisticsmodelling and simulationmanagement science and operations researchinformation systems and management ??
ID Code:
49745
Deposited By:
Deposited On:
19 Sep 2011 08:08
Refereed?:
Yes
Published?:
Published
Last Modified:
13 Oct 2024 23:56